2014 posted the second coldest Winnipeg winter in the past 75 years.

The City of Winnipeg is reporting an average frost depth of 7 feet and the expectation is that the frost will finally leave the ground sometime in June – YIKES!

Time to delay building that deck, new home, cottage or sunroom 🙁

Not so fast!  Postech Screw Piles Winnipeg is out installing extra-long 10.5 foot long heavy duty screw piles while the snow is still piled high and the frost deep as ever.

No matter how frozen the ground happens to be, Postech Screw Piles Winnipeg’s built tough installers equipped with a frost fighting arsenal will get screw piles for nearly any building project right where they need to be so you can build now!

If the roads are load restricted, that’s not a problem either, our equipment is light weight and we can access nearly any building site.

Image

Image

Image

20131119_104600

If you don’t want to wait until June for the frost to leave the ground so you can build, call Manitoba’s frozen ground piling specialists – Postech Screw Piles Winnipeg at 204.793.0653 or visit our website:  www.screwpiling.ca