Below is a picture of a piling job completed by Postech Winnipeg for a new home build in the East St. Paul / Narol, Manitoba area just outside of Winnipeg.

The basement is dug down 11 feet below grade and the screw piles are installed to 20 to 25 feet deep to total refusal.  Once installed each helical screw pile is marked according to a laser level and trimmed to just the right height.  Once installed, there is no curing time required and the form-work can begin.

More pictures to follow so stay tuned!

For a fast, free and no-obligation quote on a premium Postech Thermal Pile foundation for your building project, please call Stan Higgins, Independent Owner at 204.793.0653 or email stan@screwpiling.ca or visit www.manitobascrewpiles.ca.